Skip to main content

Table 14 Power scheduling for 10-generating unit system (5% SR) considering renewable energy in winter

From: A meliorated Harris Hawks optimizer for combinatorial unit commitment problem with photovoltaic applications

Hour Generation schedule of committed units
GU1 GU2 GU3 GU4 GU5 GU6 GU7 GU8 GU9 GU10
1 400 150 150 0 0 0 0 0 0 0
2 450 150 150 0 0 0 0 0 0 0
3 455 197.5 197.5 0 0 0 0 0 0 0
4 455 247.5 247.5 0 0 0 0 0 0 0
5 455 272.5 272.5 0 0 0 0 0 0 0
6 455 322.5 322.5 0 0 0 0 0 0 0
7 455 347.5 347.5 0 0 0 0 0 0 0
8 455 372.5 372.5 0 0 0 0 0 0 0
9 455 422.21355 422.21355 0 0 0 0 0 0 0
10 455 455 455 0 31.44 0 0 0 0 0
11 455 455 455 0 78.4 0 0 0 0 0
12 455 455 455 0 96.96 20 0 0 0 0
13 455 439.005 439.005 0 25 20 0 0 0 0
14 455 391.74 391.74 0 25 20 0 0 0 0
15 455 343.94 343.94 0 25 0 0 0 0 0
16 455 283.2 283.2 0 0 0 0 0 0 0
17 455 260.955 260.955 0 0 0 0 0 0 0
18 455 313.34 313.34 0 0 0 0 0 0 0
19 455 368.51 368.51 0 0 0 0 0 0 0
20 455 455 455 0 0 24.82 0 10 0 0
21 455 412.5 412.5 0 0 20 0 0 0 0
22 455 312.5 312.5 0 0 20 0 0 0 0
23 455 222.5 222.5 0 0 0 0 0 0 0
24 455 345 0 0 0 0 0 0 0 0