Skip to main content

Table 1 Optimal sizing of Var sources for ward hale 6 bus system

From: Management of Var sources for the reactive power planning problem by oppositional Harris Hawk optimizer

Control variables (p.u.)

Minimum

Initial [29]

HHO

Proposed OHHO

Maximum

Tap (3–5)

0.9

1.010

0.9901

0.9831

1.1

Tap (4–6)

0.9

1.01

0.9901

0.9830

1.1

VG (1)

0.95

1.05

1.0832

1.0835

1.1

VG (2)

0.95

1.125

1.0832

1.0836

1.1

VG (3)

0.95

1.07

1.0832

1.0833

1.1

QC(10)

0.0

0.939

0.0259

0.0477

0.05

Transmission Loss (MW)

10.250

05.25

05.19

  

Total operating cost ($)

5.3874

2.7588

2.7273

 Â