Skip to main content

Table 6 Performance comparison

From: A novel technique for forecasting the optimal production of a wind generator installed at any geographical point located within a very large area

Refs.

Forecast type

Method

Forecast horizon

Obtained accuracy

RMSE

MAPE (%)

R2

Yatiyana et al. [58]

Wind speed

ARIMA

6 h

4.90

Wind direction

  

15.60

Çevik et al. [59]

Wind speed

SWD-ANFIS, ANN and Ensemble methods

3 h

0.3842 m/s

Liu et al. [60]

Wind speed

ICEEMDAN-MMODA

3 h

0.35 m/s

5.02

 

Liu et al. [56]

Wind speed

Jaya-SVM

3 h

1.01 m/s

15.34

0.85

Duan et al. [57]

Wind speed

ICEEMDAN-GRU-ARIMA

15 min

0.09 m/s

2.34

 

Neshat et al. [61]

Wind speed

ED-HGNDO-BiLSTM

1 h

1.57 m/s

 

0.91

Yun Wang et al. [36]

Wind speed

CNN

1 h

0.73

9.84

0.96

LSTM

0.77

10.51

0.95

Sheng-Xiang and Lin [62]

Wind speed

HTD- MOBBSA- Seq2Seq

1 h

1.58 m/s

  

Our proposed model

Wind speed

LSTM

12 h

0.34 m/s

8.22

0.93

Wind direction

 

7.8 rad

6.09

0.70