Skip to main content

Table 8 Balances and main results of LSS farm design

From: Power management scheme development for large-scale solar grid integration

Month

Global horizontal irradiation (kWh/m2)

Horizontal diffuse irradiation (kWh/m2)

Effective energy at the output of the array (MWh)

Energy injected into the grid (MWh)

Performance ratio

January

170.2

76.90

20,869

20,504

0.771

February

160.2

72.20

19,012

18,678

0.771

March

173.1

83.20

20,006

19,656

0.772

April

159.2

85.70

17,218

16,909

0.773

May

157.1

74.90

17,283

16,968

0.780

June

144.0

86.30

15,143

14,378

0.787

July

146.3

83.70

15,276

14,999

0.780

August

147.5

83.40

15,913

15,629

0.787

September

137.0

78.80

15,360

15,076

0.782

October

138.3

82.60

15,207

14,918

0.776

November

139.6

71.80

16,139

15,839

0.779

December

135.0

73.00

16,372

16,079

0.786

Year

1807.5

952.50

203,796

200,128

0.778