From: An optimal solution to unit commitment problem of realistic integrated power system involving wind and electric vehicles using chaotic slime mould optimizer
Method
Cost without V2G in $
Cost with V2G in $
HAS [17]
573,879.34
554,134.59
CRO [9]
-
564,727.87
GA-ANN [11]
564,714
557,554.9
PSO [18]
563,741.83
559,0813.6
CS [19]
561,284.56
554,016.60
CSMA[Proposed Method]
563,698.1582
490,013.6840