Skip to main content

Table 10 Comparison of 40-unit wind–thermal system with other algorithms

From: Optimum generation scheduling incorporating wind energy using HHO–IGWO algorithm

Method

Best cost

Worst cost

Mean

CPU time (in seconds)

BMFO-SIG [20]

2,266,500$

hGWO-RES [19]

2,198,400$

hHHO–IGWO[Proposed Method]

2,172,364.16$

2,178,985.50$

2,181,325.28$

1.48