From: Optimum generation scheduling incorporating wind energy using HHO–IGWO algorithm
Method
Best cost
Worst cost
Mean
CPU time (in seconds)
BMFO-SIG [20]
2,266,500$
–
hGWO-RES [19]
2,198,400$
hHHO–IGWO[Proposed Method]
2,172,364.16$
2,178,985.50$
2,181,325.28$
1.48