Table 5 GOUPFC under single line contingency conditions with 0.5 RES

From: Performance and security enhancement using generalized optimal unified power flow controller under contingency conditions and renewable energy penetrations

Line contingency AVD PLOSS LCPIavg OOF
BAT WOA WO-BAT BAT WOA WO-BAT BAT WOA WO-BAT BAT WOA WO-BAT
0.0085 0.0036 0.0031 16.1146 14.8872 14.1166 0.0616 0.0570 0.0566 16.1847 14.9478 14.1763
38–49 0.0095 0.0072 0.0015 16.9983 16.1851 15.8523 0.0613 0.0557 0.0541 17.0691 16.248 15.9079
54–55 0.0041 0.0034 0.0009 16.2212 15.8980 15.2089 0.0547 0.0538 0.0506 16.28 15.9552 15.2604
30–31 0.0070 0.0069 0.0025 16.3144 16.0271 15.8782 0.0596 0.0554 0.0545 16.381 16.0894 15.9352
37–38 0.0105 0.0071 0.0071 17.7621 16.3370 15.6785 0.0762 0.0719 0.0616 17.8488 16.416 15.7472
53–54 0.0112 0.0059 0.0025 15.8741 15.6070 15.3534 0.0665 0.0633 0.0504 15.9518 15.6762 15.4063
50–51 0.0111 0.0058 0.0050 16.9428 16.6313 16.0376 0.0589 0.0582 0.0573 17.0128 16.6953 16.0999
46–47 0.0101 0.0075 0.0025 17.6003 17.0271 15.4511 0.0653 0.0600 0.0597 17.6757 17.0946 15.5133
41–42 0.0091 0.0062 0.0021 17.7065 16.4015 15.3100 0.0624 0.0622 0.0533 17.778 16.4699 15.3654
18–19 0.0051 0.0028 0.0021 16.9446 15.8796 14.6927 0.0639 0.0499 0.0484 17.0136 15.9323 14.7432
25–30 0.0135 0.0129 0.0090 17.5112 16.8358 16.6044 0.0730 0.0647 0.0616 17.5977 16.9134 16.675