Skip to main content

Table 8 Comparison results of 69 bus system

From: Butterfly optimizer assisted Max–Min based multi-objective approach for optimal connection of DGs and optimal network reconfiguration of distribution networks

Method DGs sizes in kW/BUS/ p.f % PLR % MLI
Scenario-1/ Power loss Minimization / Initial Configured Network
Proposed BO algorithm (500/11/0.82), (1652/61/0.81), (500/18/0.89) 97.84 NA
HTLBO-GWO [18] (523/18/0.83), (1000/61/0.82), (723/62/0.80) 96.76 NA
Scenario-1/ Power loss Minimization / Optimal Reconfigured Network
Proposed BO algorithm (1411/61/0.81), (500/64/0.83), (534/11/0.81) 97.64 NA
UVDA Method [25] (1.378 + j0.984/61), (0.62 + j0.443/11)
(0.722 + j0.514/64)
95.84 NA
Scenario-1/ Loadability Maximization / Initial Configured Network
Proposed BO algorithm (2292/61/0.8), (500/36/0.8), (724/62/0.84) NA 52.95
HPSO Algorithm [29] (3105/61/0.85), (27/63/0.85), (130/46/0.85) NA 52.95