Skip to main content

Table 9 Results of the dynamic reconfiguration of the IEEE 69-node system

From: A novel approach of a dynamic multi objective optimization of a power distribution system

Period

Active power load (kW)

SAIFI (failure/day

Without reconfiguration

After reconfiguration

Active losses power (kW)

SAIDI (h/day)

Open switches

Vmin (p.u.)

Vde(p.u.)

Active losses power (kW)

SAIFI (fail./day

Open switches

Vmin (p.u.)

Vde(p.u.)

SAIDI (h/day)

1

2967.0

0

102.58

0

(c)

0.9744

0.0254

93.85

0

(d)

0.9766

0.0234

0

2

2967.0

0

102.58

0

(c)

0.9744

0.0254

93.85

0

(d)

0.9766

0.0234

0

3

2967.0

0

102.58

0

(c)

0.9744

0.0254

93.85

0

(d)

0.9766

0.0234

0

4

2967.0

0

102.58

0

(c)

0.9744

0.0254

93.85

0

(d)

0.9766

0.0234

0

5

7000.0

1

0*

3

(c)

0*

1*

0.0038

0.941

(e)

0.9999

0.0001

2.823

6

8000.0

1

0*

3

(c)

0*

1*

0.0045

0.941

(e)

0.9999

0.0001

2.823

7

9000.0

1

0*

3

(c)

0*

1*

0.0052

0.941

(e)

0.9999

0.0001

2.823

8

10,000.0

1

0*

3

(c)

0*

1*

0.0060

0.941

(e)

0.9999

0.0001

2.823

Total

–

4

410.32

12

–-

–

–

375.41

3.764

–

–

–

11.292

Ave-rage

 

0.333

51.29

1.5

–

–

–

46.92

0.470

–

-

–

1.411

  1. *This situation is due to the fact that there is an interruption in the supply of electrical energy because the available power is insufficient
  2. (c): S69, S70, S71, S72, S73
  3. (d): S14, S57, S61, S69, S70
  4. (e): S3, S4, S5, S6, S7, S8, S9, S10, S11, S12, S13, S14, S15, S16, S18, S20, S28, S29, S30, S31, S32, S33, S34, S36, S37, S38, S40, S72, S73