Zone (grid type) | Zone 1 (AC grid) | Zone 2 (DC grid) | Zone 3 (DC grid) | |||
---|---|---|---|---|---|---|
Method | MNMCS | BOA | MNMCS | BOA | MNMCS | BOA |
Total load (kWh) | 41,280 | 41,280 | 25,800 | 25,800 | 22,080 | 22,080 |
REDG energy generated (kWh) | – | - | 32,043.6 | 32,088 | 27,468 | 27,192 |
Excess energy to AC grid (kWh) | – | - | 8200.56 | 6288 | 5123.28 | 5112 |
Substation energy (kWh) | 31,826.16 | 30,528 | – | - | – | - |
Minimum voltage @ bus (p.u) | 0.9823 @25 | 0.9831 @25 | 0.9706 @18 | 1.0000 @7 | 0.9840 @33 | 1.0000 @26 |
Maximum voltage @ bus (p.u) | 1.0000 @1 | 1.0000 @1 | 1.0000 @7 | 1.0056 @14 | 1.0000 @26 | 1.0063 @30 |
Energy loss (kWh) | 1085.52 | 648 | Â | Â | Â | Â |
Loss reduction | 67.64% | 80% | Â | Â | Â | Â |
Coal consumption (ton) | 22.28 | 19.36 | Â | Â | Â | Â |
CO2Â emission (ton) | 18.97 | 16.19 | Â | Â | Â | Â |
Energy-saving from substation | 65.60% | 67.58% | Â | Â | Â | Â |