Table 14 Optimal 24-h schedule of 30-unit test system

From: Dynamic economic dispatch using hybrid metaheuristics

Time (h)Load (MW)Time (h)Load (MW)Time (h)Load (MW)Time (h)Load (MW)Time (h)Load (MW)Time (h)Load (MW)
131085444095772136216174440215772
2333064884106216145772184884224884
3377475106116438155328195328233996
4421885328126660164662206216243552