Skip to main content

Table 3 GOUPFC under single line contingency conditions without RES

From: Performance and security enhancement using generalized optimal unified power flow controller under contingency conditions and renewable energy penetrations

Line contingency AVD PLOSS LCPIavg OOF
BAT WOA WO-BAT BAT WOA WO-BAT BAT WOA WO-BAT BAT WOA WO-BAT
0.0095 0.0080 0.0037 25.7411 24.0541 22.9129 0.0795 0.0774 0.0656 25.8301 24.1395 22.9822
38–49 0.0091 0.0083 0.0056 25.7131 25.5613 24.8907 0.0783 0.0718 0.0699 25.8005 25.6414 24.9662
54–55 0.0124 0.0094 0.0051 26.6459 25.6800 25.1792 0.0867 0.0761 0.0747 26.745 25.7655 25.259
30–31 0.0112 0.0101 0.0073 25.8862 25.8124 25.4048 0.0790 0.0767 0.0736 25.9764 25.8992 25.4857
37–38 0.0265 0.0218 0.0200 29.8423 28.8470 28.2986 0.1097 0.1042 0.0997 29.9785 28.973 28.4183
53–54 0.0092 0.0087 0.0070 26.1754 25.9726 25.9248 0.0748 0.0743 0.0722 26.2594 26.0556 26.004
50–51 0.0093 0.0084 0.0077 25.6284 25.5713 25.2467 0.0770 0.0750 0.0688 25.7147 25.6547 25.3232
46–47 0.0111 0.0097 0.0064 28.0277 26.8253 26.1605 0.0837 0.0812 0.0714 28.1225 26.9162 26.2383
41–42 0.0112 0.0059 0.0059 26.6106 26.2942 25.3860 0.0870 0.0741 0.0690 26.7088 26.3742 25.4609
18–19 0.0128 0.0106 0.0081 25.9255 24.9389 24.8706 0.0776 0.0776 0.0774 26.0159 25.0271 24.9561
25–30 0.0114 0.0101 0.0046 29.0998 28.3871 27.1199 0.0762 0.0747 0.0629 29.1874 28.4719 27.1874