Skip to main content

Table 3 GOUPFC under single line contingency conditions without RES

From: Performance and security enhancement using generalized optimal unified power flow controller under contingency conditions and renewable energy penetrations

Line contingency

AVD

PLOSS

LCPIavg

OOF

BAT

WOA

WO-BAT

BAT

WOA

WO-BAT

BAT

WOA

WO-BAT

BAT

WOA

WO-BAT

–

0.0095

0.0080

0.0037

25.7411

24.0541

22.9129

0.0795

0.0774

0.0656

25.8301

24.1395

22.9822

38–49

0.0091

0.0083

0.0056

25.7131

25.5613

24.8907

0.0783

0.0718

0.0699

25.8005

25.6414

24.9662

54–55

0.0124

0.0094

0.0051

26.6459

25.6800

25.1792

0.0867

0.0761

0.0747

26.745

25.7655

25.259

30–31

0.0112

0.0101

0.0073

25.8862

25.8124

25.4048

0.0790

0.0767

0.0736

25.9764

25.8992

25.4857

37–38

0.0265

0.0218

0.0200

29.8423

28.8470

28.2986

0.1097

0.1042

0.0997

29.9785

28.973

28.4183

53–54

0.0092

0.0087

0.0070

26.1754

25.9726

25.9248

0.0748

0.0743

0.0722

26.2594

26.0556

26.004

50–51

0.0093

0.0084

0.0077

25.6284

25.5713

25.2467

0.0770

0.0750

0.0688

25.7147

25.6547

25.3232

46–47

0.0111

0.0097

0.0064

28.0277

26.8253

26.1605

0.0837

0.0812

0.0714

28.1225

26.9162

26.2383

41–42

0.0112

0.0059

0.0059

26.6106

26.2942

25.3860

0.0870

0.0741

0.0690

26.7088

26.3742

25.4609

18–19

0.0128

0.0106

0.0081

25.9255

24.9389

24.8706

0.0776

0.0776

0.0774

26.0159

25.0271

24.9561

25–30

0.0114

0.0101

0.0046

29.0998

28.3871

27.1199

0.0762

0.0747

0.0629

29.1874

28.4719

27.1874