From: A novel approach of a dynamic multi objective optimization of a power distribution system
Maximum active power available from the source: 2000Â kW | |||
---|---|---|---|
Maximum reactive power available from the source: 1000 kVAr | |||
 | Without reconfiguration | After reconfiguration | Reduction (%) |
Total active power load (kW) | 7000.0 | 412.0 | 94.11 |
Total reactive power load (kVAr) | 5250.0 | 312.0 | 94.05 |
Open switches | S69, S70, S71, S72, S73 | S3, S4, S5, S6, S7, S8, S9, S10, S11, S12, S13, S14, S15, S16, S18, S20, S28, S29, S30, S31, S32, S33, S34, S36, S37, S38, S40, S72, S73 | / |
Active losses power (kW) | 0* | 0.0038 | / |
Reactive losses power (kVAr) | 0* | 0.0281 | / |
Vmin (p.u.) | 0* | 0.9999 (node 36) | / |
Vde (p.u.) | 1* | 0.0001 | / |
Supplied node | No | 1, 2, 3, 28, 36 | / |
SAIFI (failure/day) | 1 | 0.941 | 5.9 |
SAIDI (h/day) | 3 | 2.823 | 5.9 |