Skip to main content

Table 6 Results of the dynamic reconfiguration of the IEEE 33- node system

From: A novel approach of a dynamic multi objective optimization of a power distribution system

Period

Active power load (kW)

SAIFI (failure/day

Without reconfiguration

After reconfiguration

Active losses power (kW)

SAIDI (h/day)

Open switches

Vmin (p.u.)

Vde(p.u.)

Active losses power (kW)

SAIFI (fail./day)

Open switches

Vmin (p.u.)

Vde(p.u.)

SAIDI (h/day)

1

3635.0

0

185.72

0

(a)

0.8867

0.1133

126.56

0

(b)

0.9291

0.0709

0

2

3883.0

0

219.97

0

(a)

0.8746

0.1254

148.13

0

(b)

0.9221

0.0779

0

3

3766.0

0

203.41

0

(a)

0.8803

0.1197

137.70

0

(b)

0.9255

0.0745

0

4

3638.0

0

186.11

0

(a)

0.8865

0.1135

126.81

0

(b)

0.9290

0.0710

0

5

3605.0

0

181.79

0

(a)

0.8881

0.1119

124.10

0

(b)

0.9299

0.0701

0

6

3849.0

1

0*

3

(a)

0*

1*

76.282

0.406

(c)

0.9512

0.0488

1.218

7

3788.0

1

0*

3

(a)

0*

1*

76.282

0.406

(c)

0.9512

0.0488

1.218

8

3825.0

1

0*

3

(a)

0*

1*

76.282

0.406

(c)

0.9512

0.0488

1.218

Total

–

3

977

9

–

–

–

892.146

1.218

–

–

–

3.654

Average

 

0.375

122.12

1.125

–

–

–

111.518

0.152

–

–

–

0.456

  1. *This situation is due to the fact that there is an interruption in the supply of electrical energy because the available power is insufficient
  2. (a): S33, S34, S35, S36, S37
  3. (b): S6, S8, S13, S28, S36
  4. (c): S5, S6, S7, S8, S9, S12, S15, S18, S19, S35