From: A novel approach of a dynamic multi objective optimization of a power distribution system
Maximum active power available from the source: 2500Â kW | |||
---|---|---|---|
Maximum reactive power available from the source: 1200 kVAr | |||
 | Without reconfiguration | After reconfiguration | Reduction (%) |
Total active power load (kW) | 3849.0 | 2390.0 | 37.90 |
Total reactive power load (kVAr) | 2886.75 | 1050.6 | 63.60 |
Open switches | S33, S34, S35, S36, S37 | S5, S6, S7, S8, S9, S12, S15, S18, S19, S35 | / |
Active power losses (kW) | 0* | 76.282 | / |
Reactive power losses (kVAr) | 0* | 52.815 | / |
Vmin (p.u.) | 0* | 0.9512 (node 5) | / |
Vde (p.u.) | 1* | 0.0488 | / |
Supplied node | No | 0, 1, 2, 3, 4, 5, 15, 16, 17, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32 | / |
SAIFI (failure/day) | 1 | 0.406 | 59.4 |
SAIDI (h/day) | 3 | 1.218 | 59.4 |