From: A novel approach of a dynamic multi objective optimization of a power distribution system
Maximum active power available from the source: 5000Â kW | |||
---|---|---|---|
Maximum reactive power available from the source: 3500 kVAr | |||
 | Without reconfiguration | After reconfiguration | Reduction (%) |
Total active power load (kW) | 3635.0 | 3635.0 | 0 |
Total reactive power load (kVAr) | 2726.25 | 2726.25 | 0 |
Open switches | S33, S34, S35, S36, S37 | S6, S8, S13, S28, S36 | / |
Active power losses (kW) | 185.72 | 126.56 | 31.85 |
Reactive power losses (kVAr) | 137.67 | 130.05 | 5.53 |
Vmin (p.u.) | 0.8867 (node 17) | 0.9291 (node 17) | / |
Vde (p.u.) | 0.1133 | 0.0709 | 37.42 |
Supplied node | 0 to 32 | 0 to 32 | / |
SAIFI (failure/day) | 0 | 0 | / |