Table 15 Power scheduling for 10-generating unit system (10% SR) considering renewable energy in winter

From: A meliorated Harris Hawks optimizer for combinatorial unit commitment problem with photovoltaic applications

Hour Generation schedule of committed units
GU1 GU2 GU3 GU4 GU5 GU6 GU7 GU8 GU9 GU10
1 400 150 150 0 0 0 0 0 0 0
2 450 150 150 0 0 0 0 0 0 0
3 455 197.5 197.5 0 0 0 0 0 0 0
4 455 247.5 247.5 0 0 0 0 0 0 0
5 455 272.5 272.5 0 0 0 0 0 0 0
6 455 322.5 322.5 0 0 0 0 0 0 0
7 455 347.5 347.5 0 0 0 0 0 0 0
8 455 372.5 372.5 0 0 0 0 0 0 0
9 455 357.21355 357.21355 130 0 0 0 0 0 0
10 455 393.22 393.22 130 25 0 0 0 0 0
11 455 416.7 416.7 130 25 0 0 0 0 0
12 455 435.98 435.98 130 25 0 0 0 0 0
13 455 384.005 384.005 130 25 0 0 0 0 0
14 455 401.74 401.74 0 25 0 0 0 0 0
15 455 343.94 343.94 0 25 0 0 0 0 0
16 455 283.2 283.2 0 0 0 0 0 0 0
17 455 260.955 260.955 0 0 0 0 0 0 0
18 455 313.34 313.34 0 0 0 0 0 0 0
19 455 368.51 368.51 0 0 0 0 0 0 0
20 455 402.41 402.41 130 0 0 0 10 0 0
21 455 357.5 357.5 130 0 0 0 0 0 0
22 455 257.5 257.5 130 0 0 0 0 0 0
23 455 315 0 130 0 0 0 0 0 0
24 455 215 0 130 0 0 0 0 0 0