Table 3 Simulation results of IEEE 118-bus test system

From: Multi-objective economic operation of modern power system considering weather variability using adaptive cuckoo search algorithm

Item Scenario 1 Scenario 2 Scenario 3 Scenario 4 Scenario 5
Case (a) Case (b) Case (a) Case (b) Case (a) Case (b) Case (a) Case (b) Case (a) Case (b)
Pd (MW) 4242   4330.5   4442.6   4578.3   4737.6  
Qd (MVAr) 1438   1526.5   1638.6   1774.3   1933.6  
Pg,CE (MW) 4315.52 4065.33 4404.8 4232.37 4517.51 4358.89 4653.95 4506.39 4814.26 4675.14
Qg,CE (MVAr) 245.9 87.95 331.81 182.81 441.95 312.73 576.39 431.4 735.64 578.11
Pg,RE (MW)   250.66   172.15   158.18   147.24   138.46
Qg,RE (MVAr)   81.66   58.37   56.97   57.23   58.88
CE_Cost($/h) 129,440.95 119,544.86 133,007.71 126,156.87 137,512.82 131,191.64 142,977.15 137,072.44 149,412.16 143,825.23
Ploss (MW) 73.5234 73.9873 74.3031 74.0204 74.9098 74.4698 75.6547 75.324 76.6637 75.997
VCPIavg 0.0038 0.0037 0.004 0.0039 0.0043 0.0042 0.0046 0.0045 0.0051 0.005
AVDIavg 0.0005 0.0005 0.0006 0.0005 0.0006 0.0006 0.0007 0.0006 0.0007 0.0007